Portal de Fuente Alamo

www.portaldefuentealamo.com

Fuente Alamo - SpanishFuente Alamo - English
detail of Fuente Alamo

 

The construction of the new bridge over the ravine of Fuente Alamo improve access in the environment of the future International Airport (30/07/2009)

The Minister of Public Works and Planning, José Ballesta, accompanied by the mayor of Fuente Alamo, María Antonia Conesa, today visited the construction of the new bridge over the ravine of Fuente Alamo, a performance that is part of the Development Plan Rural Airport of the future of the Region of Murcia, and has a total budget allocation of 656,000 euros.

According to the Minister José Ballesta, "works of the new bridge, which began last December, on the one hand contribute to the revitalization of the town by improving traffic in one of the access roads to it and, secondly, improving road traffic in the vicinity of population centers in the vicinity of the future International Airport Murcia. "

Furthermore, the construction of this new bridge over the ravine of Fuente Alamo, is bringing greater fluency and pedestrian traffic in the area, which will result in a higher quality of life for residents of the municipality, which responds to the needs generated by the municipal population increase in recent years, which has prompted municipal roads bear Average Daily considerable traffic.

In this sense, the bridge will be built along an ellipse-shaped plaza that will serve as a junction to the adjacent roads and to direct traffic, which will reshape the path with new pavement in the driveway and sidewalk, and improve lighting the plaza and bridge.

On the other hand, the new bridge will link the ring road east of Fuente Alamo in the MU-601 road that leads to the future international airport of Murcia, as this action is part of the Rural Development Plan, which are making numerous actions to improve the municipalities near the future airport to adapt to the changes they will experience after the end of the works of the same.

New cycle

On the other hand, the Minister stressed that the works will provide the new bridge one lane in each direction of movement of 3.5 meters, with which shall be placed two separate bicycle lanes and two 1.5-meter summer sidewalks six feet wide for pedestrian traffic.

According to the Minister of Public Works, "this new cycle, in addition to those recently presented in different municipalities in the region, reflects the significant commitment that develops the Ministry for sustainable mobility and the integration of cycling as a method of green transportation and healthy. "

"The actions will be carried out by the bridge will seek greater safety to pedestrians traveling through the area, in addition to strengthening the conditions for a more comfortable movement for the road user," concluded Jose Ballesta.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información